When to start descent with “cross at or above” instruction

mh81
Posts: 12
Joined: Mon Feb 03, 2020 6:53 am

When to start descent with “cross at or above” instruction

Post by mh81 »

I was flying IFR to KSMO today at 6,000 feet. I received an approach clearance of “cross DARTS at or above 4,300 feet, cleared for the RNAV 21 approach” (or something similar).

My question is, when I am given that “cross at or above” instruction, am I expected to descend immediately, or at my discretion? I was still pretty far from the waypoint, and didn’t have to start my descent for another few miles. I dug around the AIM and a couple other books this evening, but wasn’t able to find clarification.

Thanks.
Shawn Goldsworthy
Posts: 514
Joined: Sun Nov 07, 2010 9:23 pm
Location: Nova Scotia, Canada

Re: When to start descent with “cross at or above” instructi

Post by Shawn Goldsworthy »

"Cross xxx at" or "cross xxx at or above" etc, will always be a pilots discretion descent.
Shawn Goldsworthy
PilotEdge ATCS
Image
jtbarton
Posts: 30
Joined: Sat Aug 08, 2015 5:27 pm

Re: When to start descent with “cross at or above” instructi

Post by jtbarton »

To follow up on this.. a question I have always wondered is if the pilot does in fact start down very early for whatever reason.. should they advise the controller? Or is the controller already protecting that area/alt anyway.

EX: SWA123 is 100 miles from ABCDE intersection at FL400. the controller issues "Cross ABCDE at/maintain FL380". SWA reads back. 5 miles later, SWA123 starts getting a rough ride at 400, and they already have their crossing... so they start down about 95 miles from the waypoint. Does SWA123 need to advs ATC?
Kyle.Sanders
Posts: 819
Joined: Sat Jan 18, 2014 5:13 pm

Re: When to start descent with “cross at or above” instructi

Post by Kyle.Sanders »

The ATC has already protected that airspace for you and has allowed you to start down at any time. If you report to him that you are leaving your current altitude without an instruction to do so by the ATC, it may be considered unnecessary radio transmissions. So... especially if it’s busy- don’t haha.
Kyle Sanders
Kevin_atc
Posts: 2042
Joined: Sat Nov 13, 2010 7:01 pm

Re: When to start descent with “cross at or above” instructi

Post by Kevin_atc »

jtbarton wrote:To follow up on this.. a question I have always wondered is if the pilot does in fact start down very early for whatever reason.. should they advise the controller? Or is the controller already protecting that area/alt anyway.

EX: SWA123 is 100 miles from ABCDE intersection at FL400. the controller issues "Cross ABCDE at/maintain FL380". SWA reads back. 5 miles later, SWA123 starts getting a rough ride at 400, and they already have their crossing... so they start down about 95 miles from the waypoint. Does SWA123 need to advs ATC?
The AIM tells you to make the report. About 90% of pilots don’t do it, but it’s not a bad idea. 99.99% of the time the controller won’t care at all, but you never know- that .01% could save your life. If you chose to not make the report, just know the “rule” you’re breaking.
Kevin
PilotEdge Marketing
Want faster answers to your forum questions? Join our Discord community: www.pilotedge.net/discord
Kyle.Sanders
Posts: 819
Joined: Sat Jan 18, 2014 5:13 pm

Re: When to start descent with “cross at or above” instructi

Post by Kyle.Sanders »

Kevin_atc wrote: The AIM tells you to make the report.
Honestly, news to me. Able to reference the chapter/section when you get a moment?
Kyle Sanders
Kevin_atc
Posts: 2042
Joined: Sat Nov 13, 2010 7:01 pm

Re: When to start descent with “cross at or above” instructi

Post by Kevin_atc »

Kyle.Sanders wrote:
Kevin_atc wrote: The AIM tells you to make the report.
Honestly, news to me. Able to reference the chapter/section when you get a moment?
It’s right there in 5-3-3.
Kevin
PilotEdge Marketing
Want faster answers to your forum questions? Join our Discord community: www.pilotedge.net/discord
Keith Smith
Posts: 9940
Joined: Sat Oct 09, 2010 8:38 pm
Location: Pompton Plains, NJ
Contact:

Re: When to start descent with “cross at or above” instructi

Post by Keith Smith »

My guess is the origin of this requirement comes from non-radar separation being used in holding stacks. When you have a bunch o' planes holding at a fix with 1k vertical separation. As the aircraft in the bottom of the stack leaves the hold, each plane above can be given a new (previously occupied) altitude to descend to as soon as the aircraft below reports leaving said altitude. In those cases, there's a tangible use for the 'leaving [altitude]' call from the pilots.
Kevin_atc
Posts: 2042
Joined: Sat Nov 13, 2010 7:01 pm

Re: When to start descent with “cross at or above” instructi

Post by Kevin_atc »

Keith Smith wrote:My guess is the origin of this requirement comes from non-radar separation being used in holding stacks. When you have a bunch o' planes holding at a fix with 1k vertical separation. As the aircraft in the bottom of the stack leaves the hold, each plane above can be given a new (previously occupied) altitude to descend to as soon as the aircraft below reports leaving said altitude. In those cases, there's a tangible use for the 'leaving [altitude]' call from the pilots.
I’m not so certain that’s relevant to this situation. The posts above are in regards to a pilot discretion descent. I can’t think of an instance where a busy controller with a thick holding stack would issue a PD descent when they really need to use that leaving altitude. If the controller really needs to assign the altitude that the aircraft is leaving, there will be nothing PD about it.

Further, a PD descent requires a report 1000ft below the altitude before it becomes assignable since an aircraft who reports leaving 15,000 in a PD descent could level at 14,900 if they wanted to. A non-PD descent can free up the reported leaving altitude pending both aircraft are of like type.
Kevin
PilotEdge Marketing
Want faster answers to your forum questions? Join our Discord community: www.pilotedge.net/discord
Keith Smith
Posts: 9940
Joined: Sat Oct 09, 2010 8:38 pm
Location: Pompton Plains, NJ
Contact:

Re: When to start descent with “cross at or above” instructi

Post by Keith Smith »

I was speaking to the utility of reporting leaving altitudes with hard assignments, not specific to PD's.
Post Reply